maybe that would have been ok. but they would have had to build the Stage 1 solar and PHES at the same time, and it have been a lot harder to get finance for that.
Anyway that's not how they did it, so they (and others) are precluded from optimal operation by rules that were not designed for the grid of the future. Having said that, I don't see why Genex can't make a submission to the AEMC requesting a rule change??
- Forums
- ASX - By Stock
- GNX
- General GNX News
General GNX News, page-249
-
- There are more pages in this discussion • 1,974 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GNX (ASX) to my watchlist
|
|||||
Last
27.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $380.9M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
GNX (ASX) Chart |
Day chart unavailable