K2H, and the associated transmission infrastructure, assists in solving the issue long-term. In shorter scales we’ll see a fix from the return of local coal operators from maintenance.
The AEMO is required to give this notice - however it is only temporary and may never eventuate.
https://www.pv-tech.org/news/queensland-solar-farm-owner-expects-speedy-solution-to-system-strength-issu
- Forums
- ASX - By Stock
- GNX
- General GNX News
General GNX News, page-495
-
- There are more pages in this discussion • 1,728 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)