Would not writeoff Para 1 totally yet as it may be able to still contribute later
"The well exhibits a rapid pressure recovery following production suggesting that it is capable of sustained high gas rates as witnessed during the testing. Work on Paradox Basin #1 is pending further evaluation of the test results.
Yes bottom draw for a while but not that long possibly as.......
Planning has commenced for a third well on the field. Paradox Basin #3 will target the crest of the Ismay Formation approximately 1.8km north east of Paradox Basin #1 along seismic line 99X. The well will be drilled from the Paradox Basin #1 pad and will deviate at approximately 36 degrees to intersect a possible reefal build-up observable on the seismic. Well design and engineering are in progress.
The company is in discussions with US financial institutions who have expressed an interest to debt fund development drilling.
I would say that approvals would be alot quicker going this route and that is why they are intending it this way.
- Forums
- ASX - By Stock
- general update
Would not writeoff Para 1 totally yet as it may be able to still...
-
- There are more pages in this discussion • 21 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)