From reading through the presentation, it appears that option three (third party)is the preferred. Either through out sourcing or a take over, and the current plan is to keep drilling and adding to the resource until the temptation to a bigger player becomes to strong. Makes sense to me, why set up another plant when the existing plans already have the demand but with a diminishing resource.
HM Demand still remains, even through this down turn. This is very much a hold.
- Forums
- ASX - By Stock
- george at conference
From reading through the presentation, it appears that option...
Featured News
Add IMA (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.3¢ |
Change
-0.001(1.35%) |
Mkt cap ! $81.98M |
Open | High | Low | Value | Volume |
7.4¢ | 7.4¢ | 7.2¢ | $30.79K | 423.1K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 63796 | 7.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.5¢ | 15000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 63796 | 0.073 |
3 | 23833 | 0.072 |
1 | 55000 | 0.071 |
4 | 497320 | 0.070 |
1 | 12000 | 0.068 |
Price($) | Vol. | No. |
---|---|---|
0.075 | 15000 | 1 |
0.077 | 96639 | 1 |
0.079 | 16889 | 1 |
0.080 | 88620 | 2 |
0.081 | 4240 | 1 |
Last trade - 15.59pm 28/06/2024 (20 minute delay) ? |
Featured News
IMA (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online