Thanks for the comparison OMG. I have been watching the geothermals for the past 9 months and came to same conclusion. I had a number of GDY shares. Their distance from the grid is an expensive issue. I thought it was $500k/km for transmission lines. That is $250 million just to get to the grid.
Good to see the debate though.
Thanks for the comparison OMG. I have been watching the...
Add to My Watchlist
What is My Watchlist?