STX 5.56% 23.8¢ strike energy limited

Bottom Hole Temperature at Irwin is ~ 150 degC which is the bare...

  1. 59 Posts.
    lightbulb Created with Sketch. 107
    Bottom Hole Temperature at Irwin is ~ 150 degC which is the bare minimum temperature needed for most commercial geothermal projects (most are much hotter). Data from Irwin won't give a lot of support and more useful data would have been collected at West Erregulla where the wells are deeper and hotter. Although the Geothermal permit covers a large area, the area with highest potential will be in the deeper/hotter part of the basin.
    Looking at Geoscience Australia's heatflow map, I'm surprised they're not looking closer at the Cooper Basin.

    https://hotcopper.com.au/data/attachments/3331/3331243-1dc7fbc1063fd2fe381043ef0e7d9064.jpg
    There's a good simple explanation of geothermal by the Australian Academy of Science here: https://www.science.org.au/curious/technology-future/feeling-heat-geothermal-energy
 
watchlist Created with Sketch. Add STX (ASX) to my watchlist
(20min delay)
Last
23.8¢
Change
0.013(5.56%)
Mkt cap ! $630.3M
Open High Low Value Volume
22.0¢ 24.5¢ 22.0¢ $2.249M 9.614M

Buyers (Bids)

No. Vol. Price($)
16 661072 23.5¢
 

Sellers (Offers)

Price($) Vol. No.
24.0¢ 870777 19
View Market Depth
Last trade - 13.10pm 18/11/2024 (20 minute delay) ?
STX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.