It's in the order of 100 kW per pump so, if you need 4 production wells to flow at 50 l/s to in order to get a production flow of 200 l/s and, say, 3 injection wells then you might need 7 x 0.1 = 0.7 MWe for internal use.
You would also need to allow for pumps to operate the cooling system, and, if you use water-cooling, another pump to bring water from a dam or river. All up, these could represent a significant chunk of a 3.8 MWe power plant, so your actual power for sale might be closer to 3 MWe, though you've paid for a 3.8 MWe plant..
Of course, these factor into the design of a low-enthalpy project - artesian flow is best (fewer pumps), and water cooling (best ORC efficiency) if there is a river or dam very close.
- Forums
- ASX - By Stock
- Geothermal discussion
It's in the order of 100 kW per pump so, if you need 4...
Featured News
Add GRV (ASX) to my watchlist
|
|||||
Last
3.6¢ |
Change
-0.003(7.69%) |
Mkt cap ! $16.51M |
Open | High | Low | Value | Volume |
3.6¢ | 3.7¢ | 3.6¢ | $14.59K | 404.8K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 47765 | 3.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.8¢ | 200000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 47765 | 0.036 |
1 | 392458 | 0.035 |
1 | 62500 | 0.032 |
2 | 446500 | 0.030 |
2 | 112000 | 0.028 |
Price($) | Vol. | No. |
---|---|---|
0.038 | 200000 | 1 |
0.039 | 49999 | 1 |
0.040 | 31650 | 2 |
0.042 | 103000 | 2 |
0.049 | 177551 | 2 |
Last trade - 15.14pm 28/06/2024 (20 minute delay) ? |
Featured News
GRV (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online