It's in the order of 100 kW per pump so, if you need 4 production wells to flow at 50 l/s to in order to get a production flow of 200 l/s and, say, 3 injection wells then you might need 7 x 0.1 = 0.7 MWe for internal use.
You would also need to allow for pumps to operate the cooling system, and, if you use water-cooling, another pump to bring water from a dam or river. All up, these could represent a significant chunk of a 3.8 MWe power plant, so your actual power for sale might be closer to 3 MWe, though you've paid for a 3.8 MWe plant..
Of course, these factor into the design of a low-enthalpy project - artesian flow is best (fewer pumps), and water cooling (best ORC efficiency) if there is a river or dam very close.
- Forums
- ASX - By Stock
- Geothermal discussion
It's in the order of 100 kW per pump so, if you need 4...
Featured News
Add GRV (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $10.89M |
Open | High | Low | Value | Volume |
2.3¢ | 2.3¢ | 2.3¢ | $1.112K | 48.33K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 56093 | 2.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.3¢ | 46201 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 56093 | 0.022 |
1 | 47380 | 0.021 |
3 | 350049 | 0.020 |
1 | 62562 | 0.016 |
1 | 50001 | 0.015 |
Price($) | Vol. | No. |
---|---|---|
0.023 | 16201 | 1 |
0.024 | 35823 | 1 |
0.025 | 9090 | 1 |
0.026 | 8731 | 1 |
0.028 | 98143 | 3 |
Last trade - 12.16pm 11/10/2024 (20 minute delay) ? |
Featured News
GRV (ASX) Chart |