It's in the order of 100 kW per pump so, if you need 4 production wells to flow at 50 l/s to in order to get a production flow of 200 l/s and, say, 3 injection wells then you might need 7 x 0.1 = 0.7 MWe for internal use.
You would also need to allow for pumps to operate the cooling system, and, if you use water-cooling, another pump to bring water from a dam or river. All up, these could represent a significant chunk of a 3.8 MWe power plant, so your actual power for sale might be closer to 3 MWe, though you've paid for a 3.8 MWe plant..
Of course, these factor into the design of a low-enthalpy project - artesian flow is best (fewer pumps), and water cooling (best ORC efficiency) if there is a river or dam very close.
- Forums
- ASX - By Stock
- Geothermal discussion
It's in the order of 100 kW per pump so, if you need 4...
Featured News
Add GRV (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.1¢ |
Change
-0.034(40.0%) |
Mkt cap ! $23.39M |
Open | High | Low | Value | Volume |
8.4¢ | 8.4¢ | 5.1¢ | $195.4K | 3.319M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 62080 | 5.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.4¢ | 100000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 62080 | 0.051 |
2 | 90000 | 0.050 |
2 | 154218 | 0.049 |
1 | 80000 | 0.048 |
1 | 32290 | 0.031 |
Price($) | Vol. | No. |
---|---|---|
0.054 | 100000 | 1 |
0.055 | 350000 | 1 |
0.056 | 100000 | 1 |
0.057 | 327978 | 1 |
0.060 | 90333 | 1 |
Last trade - 16.10pm 10/06/2024 (20 minute delay) ? |
|
|||||
Last
5.1¢ |
  |
Change
-0.034 ( 39.4 %) |
|||
Open | High | Low | Volume | ||
8.4¢ | 8.4¢ | 5.1¢ | 733835 | ||
Last updated 15.59pm 10/06/2024 ? |
Featured News
GRV (ASX) Chart |