GRV 40.0% 5.1¢ greenvale energy ltd

It's in the order of 100 kW per pump so, if you need 4...

  1. 171 Posts.
    lightbulb Created with Sketch. 26
    It's in the order of 100 kW per pump so, if you need 4 production wells to flow at 50 l/s to in order to get a production flow of 200 l/s and, say, 3 injection wells then you might need 7 x 0.1 = 0.7 MWe for internal use.

    You would also need to allow for pumps to operate the cooling system, and, if you use water-cooling, another pump to bring water from a dam or river. All up, these could represent a significant chunk of a 3.8 MWe power plant, so your actual power for sale might be closer to 3 MWe, though you've paid for a 3.8 MWe plant..

    Of course, these factor into the design of a low-enthalpy project - artesian flow is best (fewer pumps), and water cooling (best ORC efficiency) if there is a river or dam very close.
 
watchlist Created with Sketch. Add GRV (ASX) to my watchlist
(20min delay)
Last
5.1¢
Change
-0.034(40.0%)
Mkt cap ! $23.39M
Open High Low Value Volume
8.4¢ 8.4¢ 5.1¢ $195.4K 3.319M

Buyers (Bids)

No. Vol. Price($)
4 62080 5.1¢
 

Sellers (Offers)

Price($) Vol. No.
5.4¢ 100000 1
View Market Depth
Last trade - 16.10pm 10/06/2024 (20 minute delay) ?
Last
5.1¢
  Change
-0.034 ( 39.4 %)
Open High Low Volume
8.4¢ 8.4¢ 5.1¢ 733835
Last updated 15.59pm 10/06/2024 ?
GRV (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.