Report estimates 14MW to run the plant, running for 8322hrs (23 hrs of the day).
given the hydro plant is 87km away, assume 10% losses in transmission.
Implies average load on the hydro plant requires to be about 15MW, leaving about 35MW for other consumption.
Side note, storage capacity MWhrs state how many hours a 1 MW device can run for. This is very different to rate of consumption (power) MW, 1 000 000 joules consumed every second.
- Forums
- ASX - By Stock
- AVZ
- "German Refining Facility" in AVZ carbon footprint report
"German Refining Facility" in AVZ carbon footprint report, page-74
-
- There are more pages in this discussion • 56 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AVZ (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
TON
TRITON MINERALS LTD
Adrian Costello, Executive Director
Adrian Costello
Executive Director
Previous Video
Next Video
SPONSORED BY The Market Online