The board needs to reel PH in.
Stop spending on the 2.2MTPA study of complex engineering options. Stop the drilling at LJ.
Just get BS/SS into production at 1.1MTPA with the existing plant.
Get cash flow started then use that cash flow for other options.
The share price is 1/3 what it was at the start of the year while nickel price in AUS is 3x. That is PH's current score.
bacci
Add to My Watchlist
What is My Watchlist?