Good call Marty.
Don't know if there wil be a major pullback now with these grades being tested.
Drill hole SSDH038 was designed to confirm the structural
orientation of mineralisation encountered in drill hole SSDH017 (15.9
metres at 52 g/t reported on 21 June 2005, which included 0.4
metres at 900 g/t and 1.3 metres at 243 g/t).
Add to My Watchlist
What is My Watchlist?