    ""The well is expected to take 4 days to drill""

    if Mahalo #2 is successful next week then i'd expect a take off with Comets share price..

    going by previous drilling results NO reason why Mahalo#2 wont be successful..

    OPERATIONS UPDATE
    The directors of Comet Ridge Limited (ASX Code: COI) are pleased to provide the
    following activities update:
    MAHALO, QUEENSLAND (COMET RIDGE EARNING 40%)
    Mahalo 2 due to spud Saturday 26 August, 2006
    The Operator of the Mahalo project, Santos Ltd, has advised that Mitchell Drilling
    Contractors Rig 151 is moving to the Mahalo 2 location in the northern part of ATP 337P
    in central eastern Queensland and is expected to commence drilling operations on 26
    August.
    The well is expected to take 4 days to drill to a total depth of 233m where an open hole
    flow test of the target coal seams will be conducted.
    The Mahalo 2 well is being drilled to test strong gas shows encountered in the Mahalo 1
    on penetration of the target Bandanna Formation coals. No testing was possible in the
    original hole due to safety concerns.
    The hole will be drilled to 185m where 7” casing will be cemented. The prospective
    interval down to 233m will then be drilled with air to limit formation damage and then flow
    tested.
    After completion of the testing Comet Ridge will have fulfilled its earning obligation under
    the farm-in arrangement and will own a 40% working interest in the project with Santos
    and Origin Energy each retaining 30%.
    As indicated in previous Comet Ridge Limited ASX releases, the Operator has estimated
    a contingent in-place gas resource of between 180 BCF and almost 1,000 BCF for the
    Mahalo project area. The most likely volume is estimated to be in excess of 400 BCF.
    Using a recovery factor of 40% infers that between 70 and nearly 400 BCF of gas might
    be recovered. Recovery factors of 60% to 70% have been recorded in a number of
    active coal seam gas developments in the USA.
    COMET RIDGE LIMITED
    ASX ANNOUNCEMENT
    25 AUG 2006
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
11.0¢
Change
-0.005(4.35%)
Mkt cap ! $131.6M
Open High Low Value Volume
11.5¢ 12.0¢ 11.0¢ $65.48K 573.8K

Buyers (Bids)

No. Vol. Price($)
16 603081 11.0¢
 

Sellers (Offers)

Price($) Vol. No.
11.5¢ 184524 3
View Market Depth
Last trade - 16.10pm 19/09/2025 (20 minute delay) ?
COI (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.