Kendrick said drilling would continue ahead as the top of the reservoirs had come in slightly lower than prognosed.
"Ideally, over the next few days, we will be able to run the liner [and] put the overpressure protection behind casing. And that's very exciting for us because we will be able to drill reservoir at a very low level of weight.
"The base of the liner will be approximately 35m above reservoir. So once the liner is set in place, it will be pretty short work to actually tag the [Toro] reservoir."
2 days probably 3 to put in the liner.. so by tomorrow they will be drilling ahead
35 meters of drilling.. so if they drill two foot an hour then easily by monday they will be in the zone
imho they are closer than they think..
early next week i think they will be putting out a lot of news
not much time to get in before the next jump, i wonder if there will be a rush before the close
all imho and dyor
- Forums
- ASX - By Stock
- NGE
- getting closer,
getting closer,, page-115
-
- There are more pages in this discussion • 13 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NGE (ASX) to my watchlist
(20min delay)
|
|||||
Last
$1.16 |
Change
-0.020(1.69%) |
Mkt cap ! $41.24M |
Open | High | Low | Value | Volume |
$1.16 | $1.16 | $1.16 | $6.738K | 5.809K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 4000 | $1.10 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.17 | 17191 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 1000 | 1.100 |
1 | 23697 | 1.055 |
1 | 500000 | 1.050 |
1 | 3108 | 1.025 |
1 | 500 | 1.000 |
Price($) | Vol. | No. |
---|---|---|
1.165 | 17191 | 1 |
1.170 | 21000 | 1 |
1.180 | 16351 | 1 |
1.190 | 4000 | 1 |
1.200 | 100000 | 1 |
Last trade - 11.04am 08/11/2024 (20 minute delay) ? |
Featured News
NGE (ASX) Chart |
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online