Where is the 3 D modelling as per announcement 22/11/11
No updates on Japa for over 8months even though we have a full time rig drilling.
Why assay the 10 to 20,000 m of drilling (my estimates on meterage as no reports on how much we have done.Between Sept to end of Nov last year we did around 4000m).Maybe some people dont want the results as they may be able to make their own interpretation of the drilling and might not want everyone else to know.I know Goldfinger thinks we may need the $130 to $150m we have in gold to build a plant the size of Persius's. Then surely someone must think this deposit is building significantly. See post "How will the Ghana gold plant be funded" 15/6/12 Some directors (s) have spent several months there since the last report.
I suppose we will soon see either a spin out/ joint venture or other proposal that Yarri might vote through.
http://www.asx.com.au/asxpdf/20111122/pdf/422q9fdnrcfcpt.pdf
cheers
Where is the 3 D modelling as per announcement 22/11/11No...
Add to My Watchlist
What is My Watchlist?