Thanks Vig, unless the results are so poor it makes the project untenable!
Though having seen the diamonds from Blina it should be good assuming costs are OK.
The Alluvials close to the E9 pipe do contain diamonds and probably higher grade, though would take some time for mining approvals.
The previous owner just started work on some of these in the weeks before closure in 2015.
The E9 pipe will probably require "newer" technology rather than basic open cut to be profitable. There are a couple of new mining methods that may work. E4 pipe needs an improved diamond market as a lot less Fancy Yellow diamonds.
- Forums
- ASX - By Stock
- GIB - Diamond in the rough
Thanks Vig, unless the results are so poor it makes the project...
-
- There are more pages in this discussion • 296 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GIB (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.6¢ |
Change
0.000(0.00%) |
Mkt cap ! $7.614M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 52 | 3.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.7¢ | 13702 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 52 | 0.038 |
1 | 28799 | 0.036 |
1 | 127600 | 0.035 |
1 | 19384 | 0.034 |
1 | 32000 | 0.031 |
Price($) | Vol. | No. |
---|---|---|
0.047 | 13702 | 1 |
0.050 | 120000 | 1 |
0.070 | 30000 | 1 |
0.079 | 22000 | 1 |
0.080 | 29200 | 2 |
Last trade - 16.12pm 13/09/2024 (20 minute delay) ? |
Featured News
GIB (ASX) Chart |
Day chart unavailable
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online