Am I being unfair saying that GBG management must have known prior to the AGM that the proposed moisture fix was not going to work? That they nevertheless continued the line that the fix was still being developed and that they were hoping to be at full production soon after? The AGM was afterall about 2 months after the problem was flagged in a three month delivery window?