GL1 1.85% 26.5¢ global lithium resources limited

GL1 Megathread, page-10

  1. 13,509 Posts.
    lightbulb Created with Sketch. 329
    Key Highlights
    • RC drilling program of 60,000m at Marble Bar Lithium Project (MBLP) continues with a total of
    7,789m completed to date
    • 1,400 drill samples from MBLP sent to Perth for assaying with results anticipated Q2 2022
    • Diamond drilling at MBLP to test and expand the deposit at depth to commence Q3 2022
    • Experienced contractor Profile Drilling (Profile) have been contracted to undertake the RC drilling
    program which will initially comprise 20,000m at the Manna Lithium Project (Manna)
    • Mobile camp being prepared with drilling to commence in April 2022 at Manna
    • Exceptional safety performance recorded at both assets
    Drilling results of both campaigns to be incorporated into an updated Mineral Resource later this
    year

    • Global Lithium existing combined equity share (across MBLP and Manna) Inferred Mineral
    Resource of 18.4Mt @ 1.06% Li2O
 
watchlist Created with Sketch. Add GL1 (ASX) to my watchlist
(20min delay)
Last
26.5¢
Change
-0.005(1.85%)
Mkt cap ! $71.57M
Open High Low Value Volume
27.5¢ 28.0¢ 26.5¢ $37.32K 137.9K

Buyers (Bids)

No. Vol. Price($)
2 119636 26.5¢
 

Sellers (Offers)

Price($) Vol. No.
27.0¢ 3364 2
View Market Depth
Last trade - 10.58am 26/06/2024 (20 minute delay) ?
GL1 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.