Razzle, The potentially productive regions at SE2 are in three bands of higher porosity sands, separated by sands having porosities below their self imposed cutoff. When they perforated the tubing I expect that they only perforated the higher porosity regions. One thing that they could do after determining definitively where the GWC is, is to use coiled tubing to put a predetermined amount of concrete down the well so as to block off the lower band. They could do this without removing the 5,5 inch production tubing. Don't hold me to this, I am not the expert - I have not even been near a gas well.
- Forums
- ASX - By Stock
- STX
- Glass Half Full View
Glass Half Full View, page-9
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add STX (ASX) to my watchlist
(20min delay)
|
|||||
Last
21.0¢ |
Change
-0.015(6.67%) |
Mkt cap ! $601.7M |
Open | High | Low | Value | Volume |
22.0¢ | 22.5¢ | 21.0¢ | $1.393M | 6.439M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
13 | 833597 | 21.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
21.5¢ | 1173079 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
13 | 833597 | 0.210 |
33 | 1357110 | 0.205 |
25 | 1648101 | 0.200 |
17 | 656873 | 0.195 |
29 | 1603822 | 0.190 |
Price($) | Vol. | No. |
---|---|---|
0.215 | 1173079 | 4 |
0.220 | 2393975 | 7 |
0.225 | 1637488 | 25 |
0.230 | 4146358 | 27 |
0.235 | 1010867 | 17 |
Last trade - 16.10pm 03/10/2024 (20 minute delay) ? |
Featured News
STX (ASX) Chart |