    "Following commissioning activities, the full SILEX technology pilot demonstration facility is expected to be put into service as early as Q2 CY2024."

    This is from your post M.
    I took commissioning to mean the commissioing phase, the testing and preparation of individual sections of the test loop in preparation for then being put into service or the start up phase of the project. This phase is where they start and run it 24/7 to prove reliability and attain trl6.
    I didn't take put into service to mean producing product other than samples.
    Whether gle builds a plant as they say in Paducah or go for some other site first to me isn't important at all and time will tell. It's the size of that plant and time untill construction that matters.
    I know you, bb and I think perhaps bocky? (Sorry if I'm wrong bocky) think that production will probably occur at Wilmington first and I'm not saying that's impossible. Although I'll bet the three of you two beers to one that the first plant of any substantial size ( greater that 1 mill swu) will be built at Paducah not Wilmington. Payable at the first agm after we agree.
    What say you three?

 
watchlist Created with Sketch. Add SLX (ASX) to my watchlist
(20min delay)
Last
$5.50
Change
0.070(1.29%)
Mkt cap ! $1.302B
Open High Low Value Volume
$5.47 $5.60 $5.45 $2.790M 506.9K

Buyers (Bids)

No. Vol. Price($)
3 1432 $5.46
 

Sellers (Offers)

Price($) Vol. No.
$5.53 1852 1
View Market Depth
Last trade - 16.10pm 14/06/2024 (20 minute delay) ?
Last
$5.47
  Change
0.070 ( 0.94 %)
Open High Low Volume
$5.50 $5.56 $5.46 54193
Last updated 15.59pm 14/06/2024 ?
SLX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.