You can bet that 2027/28 really means at least 2028 after commissioning (an NRC operating licence) and then run up to name plate. In the DoE estimates in an earlier paper (i don't have it to hand right now) - around 9 months was set aside for commissioning. This is about usual commissioning period for most processing plants for mines and I can't think it likely to be much difference for PLEF. If they intend to start work in 2025 (after the FEED which should start soon) then a 2027 start of commissioning is IMO pretty ambitious but since they already have buildings at Paducah that should help but timescale depends upon the alterations required. Since the FEED will be going on in parallel with run up of the TRL/6 prototype you can be sure that late stage variations will be almost certain (i.e additions/modifications learnt during the TRL/6 tests) which will add complexity/cost - these will also need NRC approval which will add time. In an enrichment plant the piping (including pipes between cascades are usually a major issue but LIS should have much less stages in the cascades which will help.
Sorry but I have seen new builds and commissioning too many time before to be an optimist - you have to be realistic; NRC approvals make matters far more prone to delays (see what has happened to reactor new builds)
- Forums
- ASX - By Stock
- GLE Jobs
You can bet that 2027/28 really means at least 2028 after...
-
- There are more pages in this discussion • 134 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SLX (ASX) to my watchlist
(20min delay)
|
|||||
Last
$3.41 |
Change
-0.010(0.29%) |
Mkt cap ! $808.9M |
Open | High | Low | Value | Volume |
$3.40 | $3.54 | $3.39 | $2.560M | 739.8K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 5475 | $3.41 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$3.43 | 487 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 5475 | 3.410 |
3 | 14112 | 3.400 |
3 | 4612 | 3.390 |
4 | 13923 | 3.380 |
1 | 487 | 3.370 |
Price($) | Vol. | No. |
---|---|---|
3.430 | 487 | 1 |
3.440 | 487 | 1 |
3.450 | 487 | 1 |
3.460 | 4112 | 2 |
3.470 | 6997 | 3 |
Last trade - 16.10pm 11/09/2024 (20 minute delay) ? |
Featured News
SLX (ASX) Chart |