@CounterVin
Hey mate, the holes have to be drilled, assayed and then modelled.
With assays taking so long they need to determine a cutoff date.
Our job is to have in mind the holes that come out after the cutoff date so we can keep a track of our own expectations.
We know that since then, they have been hitting very large intersections, high grades and increasing the depth.
From those factors we know that we have added many many more oz's to the number they will be reporting.
A quick reference would be to have a look at the ann since April.
I didn't attend the meeting but there was one thing that I have picked up after from some who did.
Their Vital Statistics showing the annualised progress.
11 rigs.
Drilling-
AC 260,000m
RC 190,000m
DD 45,000m
Samples-
190,000 equating to 45 Tonnes
Let's hope they can find another Hemi or two but the oz's are now adding rapidly.
Kind regards, Wack.
- Forums
- ASX - By Stock
- DEG
- GLENN ON BLOOMBERG.
GLENN ON BLOOMBERG., page-26
-
- There are more pages in this discussion • 54 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add DEG (ASX) to my watchlist
(20min delay)
|
|||||
Last
$1.18 |
Change
-0.010(0.84%) |
Mkt cap ! $2.828B |
Open | High | Low | Value | Volume |
$1.20 | $1.20 | $1.18 | $7.303M | 6.165M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
14 | 263586 | $1.18 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.19 | 20000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 2896 | 1.180 |
6 | 42652 | 1.175 |
6 | 38599 | 1.170 |
2 | 112808 | 1.165 |
7 | 53648 | 1.160 |
Price($) | Vol. | No. |
---|---|---|
1.190 | 12808 | 1 |
1.195 | 12808 | 1 |
1.200 | 117857 | 2 |
1.205 | 62544 | 2 |
1.210 | 24544 | 3 |
Last trade - 16.10pm 26/07/2024 (20 minute delay) ? |
Featured News
DEG (ASX) Chart |