CYM 4.76% 4.4¢ cyprium metals limited

I've posted on these subjects before so it's nothing new here...

  1. 1,067 Posts.
    lightbulb Created with Sketch. 649
    I've posted on these subjects before so it's nothing new here but when you add them together and do a little maths (Just like Barry indicated on his video today) the numbers are mind boggling. And this doesn't take into account what Tesla, BYD, or the Europeans are doing with batteries.
    Anyhow take a look at the three examples. I have a conservative estimate, a bullish one by GS and the IEA estimate seems the middle ground. Now a lot of this is open to interpretation on what the different projects require. An onshore/offshore wind turbine can have different gearing and motor windings in the nacelle and many other factors so it is almost impossible to account for the differences.
    Sun Cable hasn't committed to how many cables they will run. Could be 3 or 4 depending on what article you read so I went with 3 to be conservative. The copper may well be more than what I quote as using 50kg per metre for 375-500kV cable.
    https://hotcopper.com.au/data/attachments/4886/4886035-3f7ea3bea6284976a1ada39ae3c276fc.jpg
    https://hotcopper.com.au/data/attachments/4886/4886037-08f8605a07e91808b77be0c9b9d5a4dd.jpg
    https://hotcopper.com.au/data/attachments/4886/4886040-3ac4ecbac2f8d56bfc7cc1740f20f5b7.jpg
    https://hotcopper.com.au/data/attachments/4886/4886045-190cc0dfe3f80feca02b95c7a3b209a6.jpg

    So these were the backstory for calculating copper requirements
    So here are the calculations. MISO Tranche 1 has approved 53 Gigawatts of capacity from new wind, solar, hybrid and battery storage in the US.
    https://hotcopper.com.au/data/attachments/4886/4886048-e5da1de0e03324ad2d88eeef7e5123bc.jpg
    https://hotcopper.com.au/data/attachments/4886/4886051-b481f36a3d6615682d0abd9637ea8dd5.jpg
    https://hotcopper.com.au/data/attachments/4886/4886054-f52005a9ca8e4aceaa0bde25e0eab663.jpg
    The Chaozhou offshore wind project is slated to start before 2025. Sun Cable Financial close happening 2023 & meant to be starting construction in 2024.
    Miso Tranche 1 only with a lot more to come. Chaozhou is not calculated with undersea cables to the mainland so this modeling is very conservative in all 3 models.
    Now when you look at Global Copper output you can clearly see with these few projects how much of a dent they will make in copper supply.
    https://hotcopper.com.au/data/attachments/4886/4886066-cd4c632472d101ad73650d2f0f812e97.jpg
    Used this cable for figures provided which is likely conservative for Sun Cable requiring 700-800kV cables. I believe this cable is 375-500kV
    https://hotcopper.com.au/data/attachments/4886/4886077-9a674b89ad3bf1cb084bfa61fb074975.jpg
    MISO Tranche 1 HVOT
    https://hotcopper.com.au/data/attachments/4886/4886083-582a91f7bdb4397fdf65f2a535b690b0.jpg
    More to come on MISO so stay tuned.




 
watchlist Created with Sketch. Add CYM (ASX) to my watchlist
(20min delay)
Last
4.4¢
Change
0.002(4.76%)
Mkt cap ! $67.08M
Open High Low Value Volume
4.1¢ 4.4¢ 4.1¢ $164.2K 3.856M

Buyers (Bids)

No. Vol. Price($)
11 867805 4.0¢
 

Sellers (Offers)

Price($) Vol. No.
4.4¢ 634685 3
View Market Depth
Last trade - 16.10pm 21/06/2024 (20 minute delay) ?
CYM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.