Same here @wenty. I did a little analysis on the Ishikari Wind Project using the figures provided in this previous post Post #: 65129339.
Again ran 3 possible scenarios just for the wind turbines excluding the battery storage aspect.
1. Conservative = 1,233 tonnes Cu
2. Median = 1,580 tonnes Cu
3. Bullish = 2,196 tonnes Cu
This is the turbine to be used at Ishikira.
Several sites state the optimum spacing is set between 8 and 12 times the rotor diameter in the direction of the wind, and between 2 and 4 times in the direction perpendicular to the wind. You could used this graph as a guideline for future calculations perhaps.
For simplicity, I used side by side in one row for the calculations as it is a shorter cable distance but could well be 2 rows of 7 so the cable distance would be slightly longer.
- Forums
- ASX - By Stock
- Global Wind Energy & Infrastructure
Same here @wenty. I did a little analysis on the Ishikari Wind...
-
- There are more pages in this discussion • 10 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CYM (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.4¢ |
Change
0.002(4.76%) |
Mkt cap ! $67.08M |
Open | High | Low | Value | Volume |
4.1¢ | 4.4¢ | 4.1¢ | $164.2K | 3.856M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
11 | 867805 | 4.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.4¢ | 634685 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
10 | 837805 | 0.040 |
8 | 871560 | 0.039 |
3 | 425431 | 0.038 |
3 | 633784 | 0.037 |
6 | 561111 | 0.036 |
Price($) | Vol. | No. |
---|---|---|
0.044 | 396590 | 2 |
0.045 | 613823 | 5 |
0.046 | 1673866 | 7 |
0.047 | 461111 | 2 |
0.048 | 541111 | 2 |
Last trade - 16.10pm 21/06/2024 (20 minute delay) ? |
Featured News
CYM (ASX) Chart |
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online