Yeah - could be a contractual dispute as the installation taking much longer than expected. About 3 months too long actually. Be interesting to know if it was a fixed price contract or on an hourly rate. Spectacolor would be spewing if it is a fixed priced contract. This really is very poor by Lumacom getting the estimate so wrong
- Forums
- ASX - By Stock
- glum : ((
Yeah - could be a contractual dispute as the installation taking...
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries