12 November 2010
8 holes were drilled by a combination of direct circulation
rotary and down-hole hammer drilling to a maximum depth of 150 m. No salt has been detected in drill cuttings at these shallow depths; however this does not downgrade the potential of the overall Uvs potash project in any way. The geophysical logs are yet to be received in Australia and will be analysed together with other available
information to better understand the geology of this underexplored area and to identify priority locations for a deeper drilling program seeking bedded potash that is the Company?s primary exploration target.
12 November 20108 holes were drilled by a combination of direct...
Add to My Watchlist
What is My Watchlist?