G79 0.00% 2.7¢ goldoz limited

Go long on Mustang!

  1. 11,249 Posts.
    lightbulb Created with Sketch. 29637
    Just over 2 weeks to auction. Go long on Mustang!

    DYOR. Not advice.

    The rubies! It’s all about the cashflow from the beautiful rubies. This asset will turn Mustang into a mid-cap mining company and importantly funds for development of other assets such as high grade Graphite.

    E3FE9B27-87CA-4A17-9EDD-8D121BE9D596.jpeg

    Latest corporate presentation:
    https://newswire.iguana2.com/af5f4d...4140/MUS_Announcement_6A854140.pdf?download=1

    @ekismal is tracking pre-auction and end of year share price expectations

    Latest - https://hotcopper.com.au/threads/sh...713352/page-488?post_id=27814725#.Wd1hPbbZWaM

    Mining Concession & Inventory update to 352,260 Carats


    Mustang now have a Mining Concession this means we now have a Mining company!
    • Security of tenure for 25 years!
    • More than 40 buyers registered to attend Mustang’s inaugural tender sales of Quality Ruby in just over 2 weeks time!
    For announcement
    https://newswire.iguana2.com/af5f4d...4495/MUS_Announcement_6A854495.pdf?download=1

    For more on this see @Tibbs post:
    https://hotcopper.com.au/threads/mus-granted-25-year-mining-license.3744276/#.Wd1bkbbZWaM

    EFB9AD22-D30F-4DBA-AEBB-55620C7B1D25.jpeg


    See details on quality of the deposit

    https://hotcopper.com.au/threads/mu...-secondary-deposits.3726558/?post_id=27596391

    See my inventory valuation

    My latest - https://hotcopper.com.au/threads/es...3740142/page-18?post_id=27803652#.Wd1Z6rbZWaM

    But see original post for method -
    https://hotcopper.com.au/threads/estimated-inventory-valuation-8-october.3740142/#.Wd1aLLbZWaN

    See my cashflow estimates
    https://hotcopper.com.au/threads/ca...er-2017-auction-calculated-9-october.3743073/

    Forward Plans to Rerate Share Price

    Some significant points that will support re-rating of the share price:
    • 27-30 October 2017 - maiden rough ruby auction in Port Louis, Mauritius
    • Scale-up of the plant from 1 Mtpa to 2 Mtpa capacity
    • CY 2018 - hold a minimum 2 rough ruby auctions
    • CY 2019 - hold a minimum 3 rough ruby auctions
    • Establish a minimum 10-year JORC to support a minimum 10 year life of mine
    • Double the landholdings (through access to tenements held in related companies)
    • Implication (i.e. not confirmed) of delivering dividends to shareholders (see my hypothetical analysis here)
    We also have a Maiden JORC being prepared for the Graphite. This is due this quarter but now expected before the Ruby auction is completed.
 
watchlist Created with Sketch. Add G79 (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.