Current cost for an AP1000 which would need (24 )x2 future demand is 48. @$84bn AU.
48 x $84b = $au4.032 Trillion.
- Forums
- Political Debate
- Go nuclear
Current cost for an AP1000 which would need (24 )x2 future...
-
- There are more pages in this discussion • 132 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Featured News
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online