Go nuclear, page-4

  1. 9,869 Posts.
    lightbulb Created with Sketch. 39
    Current cost for an AP1000 which would need (24 )x2 future demand is 48. @$84bn AU.
    https://hotcopper.com.au/data/attachments/5826/5826596-9f069f9cfbac4a893d4d8a6bc6acb365.jpg

    48 x $84b = $au4.032 Trillion.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.