re: norwest speeds to 05 high
Gee Domum, all GIP needs is finance and it is june-i.e.june quarter!!! Keep the faith;after all------------- Gippsland has entered into 5-year Heads of Agreement for the off-take of 650,000 pounds of tantalum per annum which equates to the total annual production.
The Abu Dabbab project has the potential to produce approximately 1.5 million tonnes per annum of ceramic grade feldspar which would be used in the European ceramic industry. In-plant testwork undertaken in Italy demonstrated that the Abu Dabbab feldspar is ideal for the production of ceramic tiles and sanitary wares, the major use of the material. Consideration of this additional phase of the Abu Dabbab project will be undertaken following commissioning of the tantalum/tin operation.
Gippsland has entered into Heads of Agreement with a major Italian ceramics group for the off-take of 2.65 million tonnes of feldspar delivered over a 4-year period.
NWE Price at posting:
0.0¢ Sentiment: None Disclosure: Held