It was only the initial resource for part of 4mile.
Not only that but it will be an extremly efficient mine. Everthing above the ore body is waste. The mine will not be as power and water intensive as other large tonnage low grade operations, resulting in significant cost reductions across the board for leaching,milling, tailings, labour, water, power, transport etc.
All this while ISL will be taking care of the Eastern deposit.......lovely.......but not looking lovely :-(
AGS Price at posting:
0.0¢ Sentiment: LT Buy Disclosure: Held