HEG Hill End Gold MC: $3.5 M SP: $0.002
The HEG gold projects in Australia are in the historically gold-rich region of Hill End – Hargraves in central New South Wales and have existing gold resources totalling 572,000 ounces.
• The three main HEG gold projects of Hargraves, Red Hill and Reward are at various stages of pre-development and permitting.
• The Hargraves project (100% owned) has a Pre-Feasibility Study completed in 2014 for a 100,000oz open pit and low impact processing project.
• Initial production of ~100,000 ounces over four years at • Production rate 300,000 tonnes per year at 2.5g/t from two initial open pits
• 11:1 waste to ore stripping ratio at a pit design gold price of A$1,450/oz
• Gold recovery of 95%
• Pre-development cost of A$2m and project capital of A$13m
• Net profit of ~A$40m after full cost recovery / royalty payments at A$1,600/oz
• Potential for Hargraves development extensions at same production rate
• Potential development of Red Hill deposit may add significant net profit
• The Red Hill project (minimum 85%) is in preparation for a PFS on an open pit project with an onsite processing plant or as a source of ore for an offsite plant.
• The Reward Gold Mine (minimum 85%) requires drilling of the near-surface Frenchmans wide zone and modification of the mining permits.
- Forums
- Commodities
- GOLD
- Gold Juniors Multibagger Thread
Gold Juniors Multibagger Thread, page-377
-
- There are more pages in this discussion • 104 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GOLD (COMEX) to my watchlist
The Watchlist
RDN
RAIDEN RESOURCES LIMITED
Dusko Ljubojevic, MD
Dusko Ljubojevic
MD
SPONSORED BY The Market Online