@Guvkbr
Don't worry about the graphite. This deposit is about 60Klm up the road from the Springdale Graphite Project.
*** released the M******Graphite Project Definitive Feasibility Study (“DFS”) on 8 January 2020. The DFS demonstrated robust economic outcomes as a concentrate-only production scenario; integrated post-tax pre-finance NPV7 of US$111 million, IRR 30% and a payback period of 2.7 years. The M****** Graphite Project delivered even more value when assessed in the context of the Company’s AAMP PFS completed in September. ***’s view is that M****** will become a crucial asset in the Company’s strategy to manufacture and supply natural graphite battery anode material to meet the fast-growing demand from the lithium-ion battery sector.
no link as I am not cross promoting
Always DYOR
- Forums
- ASX - By Stock
- Gold multibagger of 2021
@GuvkbrDon't worry about the graphite. This deposit is about...
-
- There are more pages in this discussion • 65 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)