This was the strategy from the outset, "pipeline of projects", the same strategy used by Tim Goyder, LTR riffled through a pipeline of projects (double digits) before they hit at Kathleen valley. Drill a hole with the "truth machine", will it hit? god only knows.
We hit 200 metres of Pegmatite in DD01, that's more than I ever saw at Pilgangoora (PLS) or Bald hill (MRL) when I worked there. If that hole had the right coarse strain of Spod instead of pencil style in quartz then we're all doing cart wheels and high fiving each other (very valid target), Bocca was historically the biggest mine by far in that area and had over 60 people working there at one point (large by Artisinal standards).
- Forums
- ASX - By Stock
- Gold Price
This was the strategy from the outset, "pipeline of projects",...
-
-
- There are more pages in this discussion • 149 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add OZM (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.8¢ |
Change
-0.001(2.56%) |
Mkt cap ! $6.032M |
Open | High | Low | Value | Volume |
3.9¢ | 3.9¢ | 3.8¢ | $3.877K | 100.6K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 2631 | 3.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.9¢ | 405127 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 2631 | 0.038 |
1 | 37187 | 0.037 |
2 | 95000 | 0.036 |
1 | 145285 | 0.035 |
1 | 330000 | 0.030 |
Price($) | Vol. | No. |
---|---|---|
0.039 | 405127 | 1 |
0.049 | 200000 | 1 |
0.050 | 1389083 | 3 |
0.062 | 350000 | 1 |
0.064 | 25000 | 1 |
Last trade - 16.10pm 17/10/2024 (20 minute delay) ? |
Featured News
OZM (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non Executive Director
Simon Kidston
Non Executive Director
SPONSORED BY The Market Online