Thanks nk,
Don't know where they get the $70m development cost from, though. The initial capital cost for TRY's last two mines in South America have been $US8m and $US16m.
I think the development might have been based on the IAU feasibility study, which calls for a mine producing in the order of 68Koz p.a., however in early 2007, development costs (including a contingency) was $US46m.
I can see TRY management saying, "Well, if we reduce production down to, say, 30Koz p.a., what does that do to the capital costs vs. time to first production?" These guys are extremely practical, whereas many others think they either build a big, expensive signature project, or nothing at all.
- Forums
- ASX - By Stock
- gold production at $90 an ounce ...
Thanks nk,Don't know where they get the $70m development cost...
-
- There are more pages in this discussion • 16 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TRY (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
1CG
ONE CLICK GROUP LIMITED
Mark Waller, MD
Mark Waller
MD
Previous Video
Next Video
SPONSORED BY The Market Online