Announcements in January stated:
"CIP Plant design work by GR Engineering in Perth is due to be completed by month end enabling construction quotes to be completed.
Submission of the first Mining Proposal application has gone into the Western Australian Dept of Mines and Petroleum.
Grade control drilling conducted during January on near surface high grade (NSHG) ore blocks, results are anticipated in the early part of next month..
Resource estimation continued at Delta with new JORC estimate due by end of month."
Looks like we are due or overdue for a lot of intresting news. Should not be long, I hope.
Regards,
Dratoz
- Forums
- ASX - By Stock
- AAM
- short term
short term
Currently unlisted. Proposed listing date: WITHDRAWN
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)