KAI 4.00% 1.3¢ kairos minerals limited

Energy costs are the killer for these low grade projects , any...

  1. 34,168 Posts.
    lightbulb Created with Sketch. 1887
    Energy costs are the killer for these low grade projects , any new scoping study will need to show how they can reduce energy costs for both the process plant and the machinery ie , having some form of power other than diesel trucks to exit the ore from a pit circa 200 meters in depth .
    That and largest machinery possible some automated to reduce labour costs .
    If they do then this will look more viable as a take over for a large well capitalised mining company that is prepared to take out a hedge on gold to guarantee payback on the capex IMHO , as obvious to big a project for KAI to get up and running .
    The strip ratio at around 5:1 is appealing .
 
watchlist Created with Sketch. Add KAI (ASX) to my watchlist
(20min delay)
Last
1.3¢
Change
0.001(4.00%)
Mkt cap ! $34.20M
Open High Low Value Volume
1.2¢ 1.3¢ 1.2¢ $20.52K 1.704M

Buyers (Bids)

No. Vol. Price($)
10 6737938 1.2¢
 

Sellers (Offers)

Price($) Vol. No.
1.3¢ 2392841 6
View Market Depth
Last trade - 14.52pm 04/10/2024 (20 minute delay) ?
KAI (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.