UML unity mining limited

goldstone ann.

  1. 346 Posts.
    lightbulb Created with Sketch. 29
    ...............GOOD NEWS..................


    Hopefully a lot more to come in the future.



    HIGH GRADE DRILL RESULTS FROM HOMASE/AKROKERRI
    Share this article PrintAlert
    TIDMGRL

    RNS Number : 5494W

    Goldstone Resources Ltd

    01 February 2012

    GoldStone Resources Limited

    HIGH GRADE DRILL RESULTS FROM THE HOMASE/AKROKERRI PROJECT

    GoldStone Resources Ltd ("GoldStone" or the "Company"), the West and Central Africa focused gold exploration company, is pleased to announce the results of four new drill holes at the Homase/Akrokerri project, part of the Ashanti Gold Belt in Ghana.

    Highlights:

    -- Intersections include 8.1 metres at 11.1 g/t, 9.7 metres at 6.1 g/t and 4.0 metres at 6.7 g/t

    -- The mineralisation of the high grade shoot remains open at depth
    -- Results extend the known strike length of the high grade shoot at 200 metres depth under the northern part of the Homase pit from 20 metres to 95 metres

    Hendrik Schloemann, GoldStone's Exploration Director, commented: "We are pleased to have extended the known strike extent of the high grade shoot at depth and are encouraged to see that the geometry of the shoot is predictable, the grades are consistently high and that the mineralisation remains open at depth."

    A summary of the drilling results is shown below:


    Drill hole From (m) To (m) True Width Gold grade
    (m) (g/t)
    ------------ --------- ------- ----------- -----------
    11HMRD017 237 248 8.1 11.1
    ------------ --------- ------- ----------- -----------
    11HMRD019 275 280 4.0 6.7
    ------------ --------- ------- ----------- -----------
    11HMRD020 268 281 9.7 6.1
    ------------ --------- ------- ----------- -----------
    11HMRD021 223 259 18.5 0.9
    ------------ --------- ------- ----------- -----------

    Note: Drill hole 11HMRD018 was abandoned due to technical problems before it intersected its target zone.

    Every drill hole intersected the mineralisation down-dip of GoldStone's 405,600 ounce JORC compliant gold resource at Homase/Akrokerri. These positive results indicate the potential for a resource upgrade in the future. The Company will now systematically test the down-dip extent of the gold resource along its entire four kilometre strike length and will also drill targets in the Akrokerri granite area. Since June 2011, when the drilling programme at Homase commenced, 20 drill holes totalling 5,278 metres have been completed.

    APPROVAL

    Dr. Hendrik Schloemann, who holds a PhD in geology, has reviewed and approved the geological content of this announcement.

 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.