be a good boy , and fess up watso - what you meant to write was...
good bye doleraine, good bye spp.
in a recent report, mxr mentioned the following..
"The previous diamond drillhole (DelDDH05) completed
on Saturday, 19 March 2011 ... intersected a 10 metre zone of typical quartz veining within the fault breccias at 310 metres below datum. ..... Assay results are expected
in the week commencing 11 April 2011."
april 11 was some time ago, so assume that hole 5 was a dud, and also hole 7. that means that the company has only had one good intercept, out of 6 holes,
if hole 5 is a dud - then that would indicate that there is not much strike length around hole 2 (3m at 30 g/t).
canny mxr investors will no doubt save their bickies (from the spp), and buy reduced to clear easter eggs, when the shops open, after easter
be a good boy , and fess up watso - what you meant to write...
Add to My Watchlist
What is My Watchlist?