MYG 0.33% 75.3¢ mayfield group holdings limited

good day for..., page-8

  1. 683 Posts.
    lightbulb Created with Sketch. 17
    I have zero doubt that they havnt receieved results, there are obviously delays - im not sure why.


    I also have zero doubt that the DFS will be again delayed - the drill results are being significantly delayed, so if people dont think the DFS will be significantly delayed by atleast 2-3 months, they are kidding themselves. No way this is getting to production in 2012, ide say AT BEST mid 2013.


    If people are expecting anything earlier and are going to be dissapointed by these delays, ide say sell now.


    The project is still looking very strong to me - but the timeline set out, once again just isnt achievable. Im still a very strong long term holder though.
 
watchlist Created with Sketch. Add MYG (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.