PLS 1.90% $3.09 pilbara minerals limited

Good News & Bad News, page-6696

  1. 622 Posts.
    lightbulb Created with Sketch. 103

    Purely on the maths in your final calculation. Your figure of 600,000,000 kgs of lithium required would represent 6% of the Spod required. Therefore the Spod required would be 10,000,000,000 kgs rather than 10,000,000 kgs. Stand to be corrected. Ken needs to get cracking on his JORC.
 
watchlist Created with Sketch. Add PLS (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.