It is pleasing to read the latest announcement and see that things are progressing very well.
They have managed to put in a "slimline" (600mm diameter)ventilation hole to bring air in.
That has now allowed them to get their first heavy coal cutting machine back in operation.
They are working on doing the by-pass on the main ventilation shaft and have the by-pass over half complete .....22 metres to go which should be done by end of May !
Roll on the end of May.
- Forums
- ASX - By Stock
- good progress
It is pleasing to read the latest announcement and see that...
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)