EGR 9.62% 11.8¢ ecograf limited

Hi Names, I found the below recycling process flow diagram (for...

  1. 7,943 Posts.
    lightbulb Created with Sketch. 1647
    Hi Names, I found the below recycling process flow diagram (for another recycling company not Neometals) and it indicates that the carbon anode is sieved out before the acid leaching. I wonder if Neometals have optimised their process and now remove the carbon anode prior to the acid leaching step. There is a significant amount of carbon anode material contained in the black mass so presumably there would be some savings on the acid leaching solution if the carbon was removed prior to leaching.

    Just my thoughts.
 
watchlist Created with Sketch. Add EGR (ASX) to my watchlist
(20min delay)
Last
11.8¢
Change
-0.013(9.62%)
Mkt cap ! $53.34M
Open High Low Value Volume
12.0¢ 12.0¢ 11.5¢ $12.19K 102.0K

Buyers (Bids)

No. Vol. Price($)
3 40969 11.5¢
 

Sellers (Offers)

Price($) Vol. No.
12.5¢ 70000 2
View Market Depth
Last trade - 15.49pm 09/07/2024 (20 minute delay) ?
EGR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.