Hi Names, I found the below recycling process flow diagram (for another recycling company not Neometals) and it indicates that the carbon anode is sieved out before the acid leaching. I wonder if Neometals have optimised their process and now remove the carbon anode prior to the acid leaching step. There is a significant amount of carbon anode material contained in the black mass so presumably there would be some savings on the acid leaching solution if the carbon was removed prior to leaching.
Just my thoughts.
- Forums
- ASX - By Stock
- Graphite Recycling Pilot Plant
Hi Names, I found the below recycling process flow diagram (for...
-
- There are more pages in this discussion • 42 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EGR (ASX) to my watchlist
|
|||||
Last
11.8¢ |
Change
-0.013(9.62%) |
Mkt cap ! $53.34M |
Open | High | Low | Value | Volume |
12.0¢ | 12.0¢ | 11.5¢ | $12.19K | 102.0K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 40969 | 11.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
12.5¢ | 70000 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 32273 | 0.115 |
8 | 145298 | 0.110 |
4 | 93000 | 0.105 |
12 | 220604 | 0.100 |
1 | 140000 | 0.099 |
Price($) | Vol. | No. |
---|---|---|
0.125 | 70000 | 2 |
0.130 | 19999 | 1 |
0.135 | 15000 | 1 |
0.140 | 84519 | 2 |
0.145 | 25198 | 2 |
Last trade - 15.49pm 09/07/2024 (20 minute delay) ? |
Featured News
EGR (ASX) Chart |