PVE po valley energy limited

great news from report!

  1. 2,099 Posts.
    lightbulb Created with Sketch. 23
    PVE has done well to let the market know, in advance, of the problems with the Castello well.
    The great news is that the gas bearing levels perforated in Vitalba-1dir were separate and not linked to Agnadello-1. If that had been the case then it would have been significant.
    The MAIN point being, that the results from evaluations indicate that the original gas attic reserves of Agnadello-1 remain in place and have not yet been accessed or produced from in the Vitalba-1dir well. New reservoir and geological interpretation work completed by the University of Turin (Dedicated Reservoir Engineering And Management) concluded that:
    The Vitalba-1dir gas bearing sands are distinct and hydraulically separated from the original Agnadello-1 production levels
    An unforseen cost of 2.5M for a new well is really the only downside of this situation. The 2P reserves will still be quite adequate, and will simply be reconnected back up to the grid.
    This IS A GOOD BUYING OPPORTUNITY!

    E.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
5.5¢
Change
-0.001(1.79%)
Mkt cap ! $63.74M
Open High Low Value Volume
5.6¢ 5.7¢ 5.5¢ $40.80K 737.8K

Buyers (Bids)

No. Vol. Price($)
1 70149 5.5¢
 

Sellers (Offers)

Price($) Vol. No.
5.7¢ 64913 1
View Market Depth
Last trade - 15.42pm 08/08/2025 (20 minute delay) ?
PVE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.