TON 0.00% 1.1¢ triton minerals ltd

Great Post

  1. 20,030 Posts.
    lightbulb Created with Sketch. 2621
    Check out Splitviews post from SYR thread, quality stuff!

    TON used a 9% cut off and then included all lower grade (used a 0% cut off) inside that wire frame. They also showed a 5% cut off inside the wire frame which made little difference.
    So that stuff that would be waste for SYR obviously isnt because SYR used those sort of grades in their own resource estimates.
    Btw 15.8% thats only 30m wide? Just happens to be over 5.3km long and at surface or 1-2m from surface.
    TON could simply skim 15m along that and take 200tpa for 5 years.
    Interesting SYR's over all average is lower than TONs but does have a lot in the 16-20% range which boosts its over all number. That must be more like 7% without the high grade zones?. Vanadium 0.27 Vs 0.23 V2O5 - both do very well here.
    So TON for the first 5 years could skim almost 16% from surface with equal vanadium credits.
    Theres more 12-14% at surface other than the Mutola zone, then theres more results due from the Northern zone that will no doubt add to above average grades at surface.
    So probably more like 7-8 years simply skimming the surface Sounds expensive hey?
    Probably enough time to casually find out what in Balama North, Charmers, Black Hills, Nacugi Trend and Western prospects.

    One or two things, TON is way under valued.......or SYR is about to be slaughtered.
 
watchlist Created with Sketch. Add TON (ASX) to my watchlist
(20min delay)
Last
1.1¢
Change
0.000(0.00%)
Mkt cap ! $17.25M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
1 246090 1.0¢
 

Sellers (Offers)

Price($) Vol. No.
1.1¢ 438881 2
View Market Depth
Last trade - 07.00am 09/07/2024 (20 minute delay) ?
TON (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.