EMH 0.00% 16.5¢ european metals holdings limited

The issue is not the outcome of the PFS. They should have taken...

  1. juk
    4,064 Posts.
    lightbulb Created with Sketch. 3
    The issue is not the outcome of the PFS.

    They should have taken both processing routes into the PFS. The fact that they continued to promote that L-Max was better halfway through the PFS yet came out with a worse result is a failure of management. They should have released both processing routes in the PFS.

    The two lines of babble in the PFS was insufficient to explain it. Management have a credibility problem and a communication problem. Though some of their credibility issues stem from their communication.

    I also feel that promoting the scoping study at $233M a year less than 2 weeks before releasing the PFS is a failure of their duty for continuous disclosure. There is no way that they did not know that they were about to announce $135M a year whilst continuing to promote $233M a year. Again a lack of trust in management arises from this sort of thing.
 
watchlist Created with Sketch. Add EMH (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.