Hi @traydor
Juk's right. Often engineers look after their own interests, or only do the things that they know. Perhaps Lmax was outside their comfort zone.
For example:
Follow this down the rabbit hole... look into the last project, who it was for and who the major backer was for that project. Then you may see the real reason.
- Mr Harman (B.Sc Chem Eng, B.Com) is an independent consultant with in excess of 7 years of lithium chemicals experience. Mr Harman supervised and reviewed the metallurgical test work and the process design criteria and flow sheets in relation to the LCP.
https://au.linkedin.com/in/harman-grant-61b4b712
- Forums
- ASX - By Stock
- EMH
- Great read about EMH
Great read about EMH, page-56
-
- There are more pages in this discussion • 162 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
FWD
Queensland's housing crisis an opportunity for ASX builder Fleetwood – and taxpayer cash a safe harbour from the storm
RNU
Renascor wins a funding boost given it wants to produce a critical mineral – but $5M award pales in comparison to some
Add EMH (ASX) to my watchlist
(20min delay)
|
|||||
Last
29.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $60.15M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 9214 | 26.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
30.5¢ | 6370 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 9214 | 0.260 |
3 | 15053 | 0.255 |
3 | 67651 | 0.250 |
1 | 40700 | 0.245 |
3 | 29165 | 0.240 |
Price($) | Vol. | No. |
---|---|---|
0.305 | 6370 | 1 |
0.325 | 3000 | 1 |
0.330 | 28480 | 4 |
0.340 | 8148 | 1 |
0.350 | 3125 | 1 |
Last trade - 16.12pm 11/07/2024 (20 minute delay) ? |
Featured News
EMH (ASX) Chart |
Day chart unavailable