FURTHER HIGH GRADE ORE ZONES
CONFIRMED BY FIRST PHASE DRILLING AT
CERRO NEGRO VEIN ZONE PROSPECT
HIGHLIGHTS
• Very encouraging initial results received from Phase One drill program at
Andean’s Cerro Negro gold project in southern Argentina.
• Drill results from 7 Reverse Circulation and 4 Diamond drill holes at the
Vein Zone, Cerro Negro, have been received (see figure 1).
• Drilling intercepts wide, high-grade gold zones over a strike length of
250m. Best intersections are:
o 13 metres of 6.18 g/t gold followed by 10 metres of 3.43g/t gold
(VDD – 502)
o 10 metres of 4.1 g/t gold followed by 17 metres of 3.86 g/t gold
(VRC – 505)
o 23.1 metres of 2.09 g/t gold (VDD – 503)
o 14.5 metres of 3.09 g/t gold (VDD – 505)
o 39 metres of 2.45 g/t gold (VRC – 503)
o 16 metres of 2.25 g/t gold (VRC – 504)
• Results confirm interpretations from previous explorers with mineralisation
(contained in moderately to steeply dipping quartz veins) remaining
open, particularly to the east and down dip.
• Two deep diamond holes (VDD-506 & VDD 507) completed below previously
known mineralisation have intersected quartz stockwork mineralisation
as predicted, over significant widths (>50m). Assays results are pending.
• A new zone of quartz veining (below 120m) with potentially commercial
gold grades intersected in the footwall of the previously identified main
ore zone.
• Newly identified zones of quartz stockwork uncovered by trenching
300m east of current drilling towards the adjacent Heradura prospect.
FURTHER HIGH GRADE ORE ZONESCONFIRMED BY FIRST PHASE DRILLING...
Add to My Watchlist
What is My Watchlist?