KRB has costs around $125/t for their proposed 600 000t/pa DSO operation. And they have a gas line running right next to them and can practically see the rail head. Its 120km to rail for NUP!
Although KRBs DSO stuff is a bit deeper than NUPs I think.
NUP only looks to be trying a 200 000t/pa DSO operation so this low output will further put pressure on the cost per tonne.
Any DSO operation wouldn't have a lot of margin I would say.
I dont own shares in either KRB or NUP.
NUP Price at posting:
2.5¢ Sentiment: None Disclosure: Not Held