ITC 0.00% 8.2¢ impress energy limited

14 February 2006Company AnnouncementsAustralian Stock Exchange...

  1. 644 Posts.

    14 February 2006
    Company Announcements
    Australian Stock Exchange Limited
    Level 4, 20 Bridge Street
    SYDNEY NSW 2000
    DRILLING REPORT FOR MIRAGE-2 WELL, MIRAGE OIL FIELD, PEL 115 SA COOPER BASIN
    Victoria Petroleum NL as Operator for the PEL 115 Joint Venture advises that at 0600 hours
    Central Standard Time (CST) today, the operation was changing the drill bit at 1,537 metres
    prior to drilling ahead towards total depth of 1,687 metres.
    Two cores were cut through the objective Murta oil reservoir, with fluorescence and oil
    shows being observed through the cored interval.
    A preliminary interpretation is that the two cores cut over the interval 1,322 to 1,337 metres
    have similar oil saturations to those seen in the currently producing Mirage-1 well to the
    south with the best reservoir interpreted to be present in the interval 1,322 to 1,328.5
    metres.
    The significance of these oil shows will be further evaluated by wire line logs at Total Depth
    and subsequent core analysis.
    Mirage-2 is being drilled as a Murta sand development well on the Mirage Oil Field and is 580
    metres north east of Mirage-1. The well will also test secondary targets in the McKinlay, Namur
    and Hutton sandstones.
    Commenting on the drilling at Mirage-2, Victoria Petroleum NL’s Managing Director John Kopcheff
    said;
    “Victoria Petroleum is pleased to have encountered oil shows in the targe for the first development
    well, Mirage-2, on the Mirage Oil Field.”
    “We look forward to the completion of Mirage -2 as a production well from the Murta reservoir.”
    “The Mirage-2 well is the first of a three well development program on the Mirage Oil Field.”
    “If our development program on the Mirage Oil Field is successful, as we hope it will be, we should
    see an increase in production from the current gross 400 barrels of oil per day to a target 1,000
    barrels of oil per day by mid 2006.”
    “Any increase in oil production from the Mirage Oil Field would be timely in this current time of high
    oil price.”
    The participants in the drilling of Mirage-2 and PEL 115 and their respective interests are as
    follows;
    Victoria Petroleum N.L (Operator) 40%
    Impress Ventures Ltd 40%
    Roma Petroleum N.L. 20%
    VICTORIA PETROLEUM N.L. A.B.N 50 008 942 827
    Incorporated in Western Australia
 
watchlist Created with Sketch. Add ITC (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.