PLA pacific lime and cement limited

green light from smokey hills pgm project

  1. 20,457 Posts.
    lightbulb Created with Sketch. 269
    Platinum Australia Limited
    Level 3, 18 Richardson Street West Perth Western Australia 6005 Australia
    T: + 61 8 9324 1494 F: + 61 8 9226 4259 E: [email protected] W: www.platinumaus.com.au
    ASX Release
    24 August 2006
    GREEN LIGHT FROM SMOKEY HILLS PGM PROJECT FEASIBILITY STUDY
    Platinum Australia Limited (ASX:PLA) (AIM:PLAA) is pleased to announce the final results from the Smokey Hills Project Bankable Feasibility Study (“BFS”) have shown the project to be extremely attractive and very robust and able to generate returns of over 70% on the Base Case assumptions and in excess of 600% using July 2006 metal prices and exchange rate.
    The key results from the study are as follows:-
    �� The Project would deliver a return of 74% on the Base Case and 670% at Average July Prices;
    �� The Project would achieve a pre tax NPV10 of US$60 Million on the Base Case and US$230 Million at Average July Prices;
    �� The Project would generate a cash flow (undiscounted) of US$139 Million on the Base Case and US$396 Million at Average July Prices;
    �� Initial Capital Cost of the Project would be US$40.5 Million;
    �� Cash Operating Cost of US$226/oz 4E PGM (platinum + palladium + rhodium + gold) produced (net of base metal credits);
    �� The Project has a JORC compliant reserves of 763,000 oz 4E PGM and would produce an average of 95,000 oz 4E PGM per annum over an 7 year life.
    PLA Managing Director John Lewins said: “The final results of the Smokey Hills Bankable Feasibility Study are obviously extremely pleasing and show that the project is extremely robust and would generate cash flows of almost US$400 million at July average prices and US$140 million on our conservative Base Case assumptions. The study shows the project has a low capital cost of around US$40 million with a further US$14 million sustaining or deferred capital required over the life of the operation which provides for ease of financing. The shallow nature of the deposit results in a low operating cost with production costs of less than US$230 per oz 4E PGM, providing for a high margin operation”.
    “We are well advanced in the arrangements for the debt portion of funding for the project and with the applications for various permits necessary to commence operations. PLA has in excess of AUS$25 million in cash and therefore has the necessary funds to provide the equity required to develop the project.”
    Platinum Australia Limited
    Level 3, 18 Richardson Street West Perth Western Australia 6005 Australia
    T: + 61 8 9324 1494 F: + 61 8 9226 4259 E: [email protected] W: www.platinumaus.com.au
    A full summary of the results are provided in Table 1 below and the underlying assumption relating to metal prices and exchange rates are provided in Table 2. The final results are largely consistent with the preliminary results previously released and improvements in the IRR and NPV are due to an increase in the Base Case assumption of rhodium price from US$1,000 in the preliminary figures to US$1,500 in the final figures. This change was made on the basis of currently available projections of metal prices obtained from various industry sources.
    GRD Minproc (Pty) Ltd are the Lead Engineers for the BFS, while Snowden are responsible for the Resource Estimate and Mining Study, SRK Consulting for Tailings and Hydro-geological studies and Africa Geo-Environmental Services for the Environmental Study.
    Table 1 Summary of Results from Smokey Hills BFS
    Base Case
    Ave July Prices
    Production
    4E PGM
    ~95,000 oz/annum
    Plant Recovery
    85%
    Project Life
    7 years
    Cash Costs
    4E PGM
    US$226/oz
    US$226/oz
    Basket Price
    4E PGM
    US$677/oz
    US$1,117/oz
    Capital Cost
    Initial
    US$
    $40.5 Million
    $40 Million
    Deferred
    US$
    $14 Million
    $14 Million
    NPV
    10%
    US$
    $79 Million
    $249 Million
    15%
    US$
    $60 Million
    $202 Million
    IRR
    74%
    672%
    Cashflow
    US$
    $139 Million
    $396 Million
    Payback
    months
    20 months
    3 months
    Platinum Australia Limited
    Level 3, 18 Richardson Street West Perth Western Australia 6005 Australia
    T: + 61 8 9324 1494 F: + 61 8 9226 4259 E: [email protected] W: www.platinumaus.com.au
    Table 2 Metal Price and Exchange Rate Assumptions
    Table 2
    Rand/US Dollar Exchange Rates and Metal Prices
    July Average
    Base Case
    Exchange Rate
    ZAR/US$
    7.08
    7.0
    Metal Prices
    US$
    ZAR
    US$
    ZAR
    Platinum
    Per oz
    1,232
    8,723
    900
    6,300
    Palladium
    Per oz
    321
    2,273
    300
    2,100
    Rhodium
    Per oz
    4,622
    32,724
    1,500*
    10,500*
    Gold
    Per oz
    633
    4,482
    450
    3,150
    Iridium
    Per oz
    400
    2,832
    100
    700
    Ruthenium
    Per oz
    172
    1,218
    250
    1,750
    Nickel
    Per tonne
    26,500
    187,620
    10,000
    70,000
    Basket Price
    Per oz
    1,117
    7,906
    677
    4,736
    * The Base Case Rhodium Price has been increased from US$1,000 used in the preliminary figures to US$1,500 in the final figures as a result of review of projected metal prices obtained from various industry sources.
    Smokey Hills PGM Project
    The Smokey Hills PGM Project is located on the eastern limb of the Bushveld Complex in the Limpopo Province, 300 kilometres north of Johannesburg.
    PLA has signed a formal Sale Agreement with Smokey Hills Platinum (Pty) Ltd (“SHP”) to acquire up to 80% of the Project through the staged acquisition of 100% of SHP. PLA acquires an initial 74% interest in SHP by providing $3.4 million for SHP to fund the purchase of an 80% interest in the Project. The balance of 26% in SHP will be acquired for 15 million fully paid shares in PLA. The balance of the Project is held 5% by the local community and 15% by Corridor Mining Resources, a Company owned by the Limpopo Provincial Government.
    PLA commenced a resource definition drilling program on the project in July 2005 and a Bankable Feasibility Study with GRD Minproc as the Lead Engineer in October 2005.
    The Company envisages commencing operations at Smokey Hills initially as an open cut and then progressing to an underground mine. During the initial phase while the plant is under construction PLA proposes to mine ore for toll treatment through a nearby plant to generate early cash flow. This phase would last for approximately 12 months after which ore would be treated through the on-site plant producing a flotation concentrate for sale to any one of a number of smelters in South Africa, the nearest of which is less than 100 kilometres distant.
    Dependent on the issuing of the necessary permits PLA proposes to commence construction and mining operations in the December 2006 quarter or in early 2007 with plant commissioning occurring in December 2007.
    Qualification Statement
    We confirm that the exploration results and resources contained in this report are based on information compiled by Tony Greenaway, Geology & Resources Manager of Platinum Australia Limited, who is a member of The Australasian Institute of Mining and Metallurgy.
    Tony Greenaway has more than five years experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking, to qualify as a competent person as defined in the 2004 edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Tony Greenaway consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.
    Yours faithfully
    PLATINUM AUSTRALIA LIMITED
    JOHN D LEWINS
    Managing Director
    Further Comments:
    Media Enquiries:
    Ron Marshman / John Greenhalgh
    City of London Public Relations
    P: +44 (020) 7628 5518
    Media Enquiries:
    Sarah Allchurch
    Allchurch Communications
    P: (08) 9381 6625
    M: 0412 346 412
    Mr John Lewins
    Managing Director
    Platinum Australia Limited
    P: (08) 9324 1491
    M: 0419 910 061
    Platinum Australia Limited
    Level 3, 18 Richardson Street West Perth Western Australia 6005 Australia
    T: + 61 8 9324 1494 F: + 61 8 9226 4259 E: [email protected] W: www.platinumaus.com.au
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
25.5¢
Change
0.005(2.00%)
Mkt cap ! $213.4M
Open High Low Value Volume
25.5¢ 25.5¢ 25.5¢ $5.126K 20.1K

Buyers (Bids)

No. Vol. Price($)
3 22488 25.0¢
 

Sellers (Offers)

Price($) Vol. No.
26.0¢ 500000 1
View Market Depth
Last trade - 16.10pm 17/09/2025 (20 minute delay) ?
PLA (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.